Irrigation Connection Point Retro-fit Project Phase 2


Project Year:

2018

Project Budget:

$40,000

WCQI Grant:

$30,000

Organization:
City of Kelowna

Project Description:

The strategic goal is reduce water consumption through accurate flow monitoring. To date in this industry field components have not been compatible to provide reliable flow information to the central control system. Phase 2 Trial work will close the loop on the field communication issues and provide the data to shut down irrigation system breaks that wastes water and causes property damage.


Filed under:
,