Irrigation Connection Point Retro-fit Project Phase 2
Project Year:
2018
Project Budget:$40,000
WCQI Grant:$30,000
Organization:City of Kelowna
Project Description:
The strategic goal is reduce water consumption through accurate flow monitoring. To date in this industry field components have not been compatible to provide reliable flow information to the central control system. Phase 2 Trial work will close the loop on the field communication issues and provide the data to shut down irrigation system breaks that wastes water and causes property damage.